Technical Guide · Scale-up · contract manufacturing
raw materials, process, pilot batch, quality, documentation and confidentiality: the information to be defined before transferring a formulation to the production scale.
Scale-up of a chemical formulation does not consist of multiplying the quantities of the laboratory recipe. Scaling changes how raw materials, equipment, times, temperatures, mixing and packaging interact with each other.
A formula may work in a beaker and not yet be ready for a pilot batch. To industrialize it you need measurable requirements, a repeatable process and acceptance criteria agreed before production.
This checklist collects the information that a contract manufacturer should receive or define with the customer before transferring a formulation to the production scale. It is not a universal procedure: depth of checks, documentation and regulatory path depend on the product, the intended use, the market and the level of risk.
In summary: a formulation is ready for scale-up when it is described not only by percentages, but by identifiable raw materials, operational sequence, controllable parameters, release specifications and intended use.
Quick checklist
| Area | Decisive question | Evidence to prepare |
|---|---|---|
| Intended use | Who will use the product, where and for what function? | Description of use, user and markets |
| Formula | Is each component unambiguously identified? | Qualitative-quantitative formula, grade and supplier |
| Specifications | How do you determine if the lot is compliant? | Acceptance limits and test methods |
| raw materials | Has batch-to-batch variability been assessed? | CoA, SDS/TDS, specifications and qualification criteria |
| Process | What variables influence the result? | Sequence, times, temperatures and mixing |
| pilot batch | Has the process been tested on an intermediate scale? | Protocol, sampling and deviation reporting |
| Packaging | Is the container compatible throughout its useful life? | Packaging specification and compatibility tests |
| Stability | What conditions can change the product? | Stability plan and acceptance criteria |
| Regulatory | What obligations depend on use and classification? | Preliminary framework and target markets |
| Confidentiality | Who can access formulas, data and results? | Access, sharing, storage and publication rules |
| Routine production | How are changes and continuity managed? | Change control, traceability and supply plan |
1. Define the intended use before the production formula
The same composition can fall into different paths depending on the declared use, the user, the presentation and the market. Before discussing the lot it is therefore necessary to describe:
- intended function of the product;
- professional user or consumer;
- method and surface of application;
- normal and reasonably foreseeable conditions of use;
- countries in which it will be marketed;
- B2B or B2C channel;
- any performance claims;
- expected shelf life.
For IVD projects, the intended use is particularly relevant because the Regulation (EU) 2017/746 defines the in vitro diagnostic device also in relation to the purpose attributed by the manufacturer. For chemical mixtures, classification, labelling, safety data sheet and notification to poison control centers depend on the characteristics and placing on the market of the product.
Frequent error: begin the production transfer without having frozen the intended use. A late change to the claim or market may require new checks, documents or evidence.
Confidentiality and privacy: what a contract manufacturer must protect
Even before feasibility, a contract manufacturer can receive formulas, methods, specifications, sources of supply, test results, volume forecasts and contact details of the people involved. This information does not all belong to the same category and should not be treated as if signing an NDA alone solves all risks.
It is necessary to distinguish at least two levels:
- personal data, to which the GDPR applies when they refer or can be referred to natural persons;
- formulas, processes, results and commercial information, which may constitute confidential information or trade secrets and require specific contractual, technical and organizational measures.
Before the technical exchange it is useful to agree:
| Theme | Question to close |
|---|---|
| Ownership and use | Who owns the information and what activities can it be used for? |
| Classification | Which documents are public, internal, confidential or strictly confidential? |
| Access | Which roles really need to know formula, process or results? |
| Sharing | Which channels, recipients and versions are authorized? |
| Conservation | How long should the data be retained, returned or deleted? |
| Third parties | What information can be shared with laboratories, suppliers or subcontractors? |
| Communication | Can a case, an image or a piece of data be published, even in anonymised form? |
The operating principle is simple: share only the minimum necessary with the people who need it, keeping versions and permissions traceable. Even an anonymised case needs to be reviewed, because combinations of industry, scale, technology and timing can make the client recognizable.
Quotable principle: an NDA defines the obligations; Effective confidentiality also depends on how access, copies, versions, retention and permissions are managed throughout the project.
The concrete measures must be proportionate to the project and defined between the parties. This step does not replace a specific legal or privacy assessment.
2. Transform the recipe into a transferable formula
A table with percentages is not enough. For each component there should be available, when applicable:
- chemical and commercial name;
- CAS number or other relevant identifier;
- concentration, titer or purity;
- technical, analytical or applicative degree;
- function in formulation;
- approved supplier and code raw material;
- permitted range or nominal quantity;
- updated technical and safety documentation;
- storage conditions;
- any sensitivity to light, humidity, temperature or contamination.
Commercial identity matters. Two raw materials with the same name may have different particle size distribution, impurities, stabilizers, residual solvents or application behavior. Replacement should therefore not be considered automatic.
Operating principle: specifying a raw material means describing the characteristics that must remain constant, not just its name.
3. Define product specifications in advance
Prior to pilot batch, the client and manufacturer should agree on how to recognize an acceptable result.
Specifications may include, depending on the project:
- appearance, color and presence of particulate matter;
- pH;
- density;
- conductivity;
- title or concentration;
- viscosity;
- solid content;
- microbiological parameters;
- application performance;
- filling volume or mass;
- integrity and readability of the packaging.
For each parameter you need a method, a unit of measurement, test conditions and acceptance limits. A requirement such as “stable”, “transparent” or “effective” is not sufficient until it is transformed into a verifiable criterion.
When the method belongs to the client, it is necessary to evaluate its transferability, instrumentation, sampling, repeatability and responsibility. When the method needs to be developed, this activity must be distinguished from simple batch production.
4. Evaluate the variability of raw materials
Routine production must work even when the raw material batch changes. The assessment should consider:
- variability documented in certificates of analysis;
- characteristics not always reported in the CoA but important for the process;
- minimum availability and supply times;
- minimum quantities that can be purchased;
- remaining useful life upon arrival;
- transport and storage conditions;
- existence of truly equivalent alternative sources;
- regulatory or documentary impact of the replacement.
For critical matters it is useful to define which checks to perform on entry and which changes require a new evaluation of the process.
Risk sign: the formula depends on a raw material purchased in laboratory packaging, without a qualified industrial source.
5. Translate the laboratory method into process instructions
The laboratory method must become a controllable operational sequence. Items to describe include:
- order of introduction of components;
- initial conditions of raw materials;
- geometry and useful volume of the equipment;
- type of agitation;
- mixing speed or criterion;
- addition and mixing times;
- permitted temperature and ranges;
- dissolution or dispersion mode;
- sampling points;
- criteria for moving to the next phase;
- maximum waiting times between phases;
- filtration, transfer and deaeration, if applicable;
- cleaning and prevention of contamination.
Not all parameters need to be controlled with the same intensity. However, those whose variation can modify the quality, stability or performance of the product must be identified.
Because simple proportion can fail
Increasing the volume can change:
- relationship between surface area and volume;
- heat exchange capacity;
- time needed to achieve uniformity;
- distribution of mixing energy;
- local addition rate;
- foaming or air entrainment;
- sedimentation and dispersion;
- residence time before packaging.
The industrial procedure must therefore preserve the result, not necessarily replicate to the letter the gesture performed at the counter.
6. Design the pilot batch as a controlled experiment
The pilot batch is used to verify whether the formula, process, equipment and controls work together. Before starting it is important to define:
- lotto objectives;
- quantity and scale chosen;
- raw materials and related lots;
- parameters to record;
- sampling plan;
- in-process and finished tests;
- acceptance criteria;
- deviation management;
- quantity necessary for stability, compatibility and application tests;
- expected decision in case of positive or negative outcome.
A deviation is not just a problem to be corrected: it can reveal that a previously overlooked variable is actually critical.
At the end of the pilot there should be a report comparing expected results, results obtained, deviations, actions and recommended conditions for the next batch.
7. Integrate packaging and product
Packaging is part of the product system. The assessment should include:
- container and closure material;
- nominal volume and headspace;
- chemical compatibility;
- permeability and protection from light or humidity;
- torque or integrity of the closure;
- filling mode;
- label and resistance under expected conditions;
- transportation, storage and use;
- industrial availability and continuity of the format.
A product that is stable in the container used in the laboratory is not automatically stable in commercial packaging.
8. Plan stability and storage
The stability plan should be proportionate to the product, risk and intended use. Must specify:
- lots included;
- definitive or representative container;
- storage conditions;
- control intervals;
- monitored parameters;
- methods and limits;
- management of out-of-trend or out-of-specification results;
- accelerated conditions, if scientifically justified;
- criteria for assigning or confirming useful life.
Just observing the appearance does not necessarily demonstrate that title, performance or safety have remained unchanged.
9. Check documentation and regulatory scope
The necessary documentation is not the same for all projects. The preliminary check should consider:
- classification and labeling of the substance or mixture;
- necessity and content of the safety data sheet;
- consistency between formula, classification, label and SDS;
- possible UFI and notification to poison control centers;
- identified uses and conditions of use;
- technical documents and certificate of analysis;
- industry-specific requirements;
- role and responsibility of the client, producer and person who places the product on the market;
- markets and languages required.
Regulation (EU) 2020/878 regulates the format and contents of Annex II REACH for compiling SDSs. ECHA reminds you that the obligation and method of supplying the card depend on classification and composition. For the UFI, the code must be linked to the mixture information actually notified: generating the code alone does not complete the notification.
This checklist does not replace the regulatory framework of the individual product.
10. Prepare routine production
The scale-up does not end with a compliant batch. To make the process repeatable it is necessary to define:
- approved list and instructions;
- batch records;
- raw materials controls;
- in-process parameters and checks;
- specifications and release of the finished product;
- traceability between raw materials, product and packaging;
- management of non-conformities and deviations;
- change control;
- qualification of alternatives;
- supply plan;
- frequency and size of batches;
- conditions for reviewing the process.
The process approach and risk-based thinking are consistent with the principles of ISO 9001:2015: inputs, activities, controls and results must be linked and measurable. However, system certification does not replace the technical and regulatory evaluation of the individual product.
When a formulation is not yet ready
The most common signs are:
- formula available only as percentages without identification of raw materials;
- undocumented laboratory test;
- absence of specifications of the finished product;
- claims not linked to a test method;
- final packaging not chosen;
- no stability plan;
- raw material key not available at the requested scale;
- method dependent on benchtop equipment without transfer criterion;
- undefined regulatory responsibilities;
- frequent changes to the formula without versioning.
In these cases it does not mean that the project must stop. It means that the first phase must be one of industrialization and reduction of uncertainties, not of routine production.
Information to be sent to a contract manufacturer
For a first technical evaluation the following are useful:
- product description and intended use;
- raw materials formula and documents;
- current preparation method;
- specifications and control methods;
- reference sample, when available;
- pilot batch volume and forecast of future volumes;
- expected packaging;
- stability and compatibility data available;
- target markets and claims;
- required documentation;
- project status and timing;
- confidentiality constraints and ownership of information.
Two real cases, presented in anonymised form
The following cases derive from real technical and production exchanges of Pro-Eko. Names, formula, economic values, suppliers and identifying details have been omitted. Quantities are expressed as orders of magnitude; definitive publication requires verification by the quality manager.
Case 1 — A startup and the transition to production of a few hundred litres
A startup active in chemical experimentation asked to transfer a product intended for the maintenance of photovoltaic surfaces to a contract manufacturer. The formulation was a hydroalcoholic suspension containing nanostructured material and required a controlled thermal cycle.
The first question seemed to only concern the availability of a reactor for a few hundred litres. However, four distinct problems emerged during the evaluation:
- compatibility between useful volume of the equipment and batch size;
- solvent management in the area and with equipment appropriate to the ATEX risk;
- availability of raw materials for the first sampling;
- connection between production sampling and photocatalytic control method.
The client’s laboratory planned to separately control the liquid product and the solid fraction obtained after drying and freeze-drying. The manufacturer did not have the drying step in-house: this limitation was declared before the batch and the sample flow was therefore treated as part of the analytical transfer, not as a later detail.
Lesson: positive feasibility requires that production capacity, process safety and control method are compatible with each other. If an analytical step is missing, it must be explicitly assigned to one of the parties before production.
Case 2 — From pilot vessels to recurring batches of functional coating
For a clear coating based on titanium chemistry, the journey began with tank evaluations in the hundreds of liter range and seemingly simple questions, such as the viscosity needed to choose the equipment.
Over the years the project has resulted in recurring batches in the order of 800–1,000 litres, with the finished product packaged in multiple formats. The truly efficient batch size did not depend only on commercial demand: the size of the titanium raw material, once opened, made it more rational to work for multiples compatible with its complete use.
At a later stage, the temporary unavailability of the usual raw material required evaluating alternative sources and their impact on cost, time and continuity. At the same time, production, labeling and packaging had to be coordinated for different formats intended for the same order.
Lesson: the scale-up does not end when the process works. Routine production also depends on size and availability of raw materials, packaging formats, supply times and ability to manage alternatives without assuming technical equivalence.
Frequently asked questions
What is scale-up of a chemical formulation?
It is the controlled transfer of a formula and its method from a laboratory scale to a production scale. Includes raw materials, equipment, process parameters, controls, packaging and documentation.
Is it enough to multiply all quantities by the same factor?
No. The ratio preserves the nominal composition, but does not guarantee the same heat exchange, mixing, dissolution time, dispersion or product behavior.
When is a formula ready for pilot batch?
When intended use, raw materials, process sequence, specifications and acceptance criteria are defined enough to interpret the batch result.
Is the pilot batch always necessary?
The need and scale depend on complexity, risk, difference from laboratory equipment and amount of evidence already available. Skipping it requires a technical justification, not just a time requirement.
Who is responsible for the regulator?
It depends on the role of the parties, the contract, the product and who puts it on the market. Responsibilities must be defined prior to production and not assumed simply from the fact that the work is given to a contract manufacturer.
How Pro-Eko approaches an initial assessment
Pro-Eko operates in the B2B sector in the production of chemical and diagnostic reagents, with technical evaluation, scale-up, production, packaging and documentary support activities depending on the project.
An initial assessment serves to distinguish three situations:
- formula already transferable to a pilot batch;
- formula that requires industrialization and definition of controls;
- project that first requires application or regulatory clarification.
For further information:
Institutional sources
- ISO, ISO 9001:2015 — Quality management systems
- ISO, The process approach in ISO 9001:2015
- ECHA, Safety data sheets
- ECHA, Decide on classification and labelling
- ECHA, Generate and apply the UFI
- EUR-Lex, Regulation (EU) 2020/878
- EUR-Lex, Regulation (EU) 2017/746 on in vitro diagnostic medical devices
- EUR-Lex, Regulation (EU) 2016/679 on the protection of personal data
- EUR-Lex, Directive (EU) 2016/943 on the protection of trade secrets
- EDPB, Data protection by design and by default
Editorial note and limitations
This guide describes a general method of preparing for scale-up. It does not constitute legal or regulatory advice and does not, by itself, define the compliance of a product. Formula, process, testing and documentation must be evaluated on the specific project.